+1 (727) 723-3300

Smarter Materials for Next Generation Infrastructure

Arlington National Cemetery
sustainable sidewalks

The Challenge

Design and implement a sustainable sidewalk system to handle foot traffic while blending in with the surroundings.

Our Solution

KBI Flexi-Pave was selected for installation of the first sidewalk project undertaken at Arlington National Cemetery.

  • Client:
    Arlington National Cemetery
  • URL:
    http://www.arlingtoncemetery.mil
  • Date:
    10 Oct 2011